CONTENTS (eontinued)
PAGE
2.2.6
2.2.7
72
CLEANUP PHASE
“Ama — wh &
po po po ee eb
$2 £9 Go bo fo bo Go
2.3
68
70
Certification
Planting of Coconuts
Scope of DOE Responsibility
ERSP Conceptand Staffing
Chronology
ERSP Management and Planning Philosophies
Typical Sequence of ERSP Radiological Surveys
Operational Planning and Coordination
ERSP Facilities and Logistic Support
72
72
74
74
75
76
77
CHAPTER THREE: ON-SITE RADIOLOGICAL MEASUREMENTS
361
AERIAL SURVEYS
3.2
FIELD MEASUREMENTS
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.2.10
Introduction
Instrumentation
Data Reduction Procedures
Operational Procedures
System Calibration
Variables Affecting the 241 Am Conversion Factor
Other Sources of Error
Detector Field-of-View
Comparison with Soil Sample Data
Results for !97Cs and 6°Co
3.3
SOIL SAMPLE MEASUREMENTS
102
3.4
OPERATIONAL EXPERIENCE
104
3.4.1
104
105
106
106
3.4.2
3.4.3
3.4.4
IMP Operations
Maintenance Scheme
Liquid Nitrogen
Detector Performance
CHAPTER FOUR: RADIOLOGICAL LABORATORY OPERATIONS
4.1
DESCRIPTION OF FACILITIES
1
Sample Preparation Laboratory
4
Instrument MaintenanceFacility (IMF)
2
-1.3
4.2
107
Wet Chemistry Laboratory
Counting Laboratory
107
111
111
115
SUPPORT PROGRAMS
115
4.2.1
4.2.2
115
118
121
122
122
122
4.2.3
4.2.4
4.2.5
4.2.6
Transuranics (TRU) Program
Fission Product Data Base (FPDB) Program
Aomon Crypt Sampling
Soil Archiving
Soil Sample Data Base
Additional Support Programs
xii