3 March 1959, Rover Program Report by Keith Boyer:

There is

evidence starting about this time and a little bit before
this that

J-Division is about to get very involved in the Rover
program.
3 March 1959, J-6 Report:

SeppeOE

oY

As. for weapons testing at EPG xx it
.

is noted that design for future work continues and is still ona
Hesurly schedule of completion.

Further it is stated that EG&G

7 can meet a 90-day deadline if there are not simultaneous operations
at NTS and EPG.

As for NTS, bids for the 4 500-foot safety holes

were postponed a week to 24 February; the pinex-on-a-bal loon testing
was sucessfully completed; exploration of holes in area 3 is
continuing but with some difficulty due to eqkipment damage; and
several other minor type items at NTS are noted here.

As for

Los Alamos J-6 states that a survey was made of various areas in
testing.

a

Los Alamos with a view toward reactor