(apa

-e
e):
OPERATION

—& ;

TUMBLER-SNAPPER

R
4) CES Se OP

Shot

No.

1

Date

Yield

April 1, 1952

eC

1.05 ¥T (Radchem Yield)

April 15, 1952

3

1.17 KT

April 22, 1952

4

30.7 KT

May 1, 1952

5

10.2 KT

May 7, 1952

6
7

"

"

"

12.0 ET

May 25, 1952
June 1, 1952

8

ot

11.1 KT
14.6 KT

June 5, 1952

13.9 KT

OPERATION IVY

1
2

November 1, 1952
November 16, 1952

10-12 MT
S70 xq

OPERATION UPSHOT-KNOTHOLE

1
2

March 17, 1953
March 2h, 1953

3
dt

March 31, 1953
April 6, 1953

5
6

of = 2 KT
10-11 KT

April 11, 1953
April 18, 1953

7

5 KT
27-23 KT (Poss = 23 KT)

April 25, 1953

8

9

SO KT

May 3, 1953

25.9 KT

May 255

15.7 KT

May 19, 1953

10

11

OPENNET ENTRY

ms
Ausmorized for Pubic 8 Seeate:
cre n OpenNet

15-20 KT
27~36 KT

.

Date:

orized d for for P Public
oO Authorize
oO By

Release
Date

31.5 KT -

1953

DEPARTMENT OF ENERGY DECLASSIFICATION REVIEW

SINGLE REVIEW AUTHORIZED BY:

omen 000oe
s

NAME:

DATE:

L

i

?

‘L 4

DETERMINATION (CIRCLE NUMBER(S)}
V.CLASSIFICATION RETAINED

GAISSSINCATION CANCELLED.
7 OTHER (SPECIFY):

Select target paragraph3