CHAPTER 3
ENGINEERING, CONSTRUCTION, AND
MAINTENANCE OF BASE FACILITIES
the utility systems and housing and feeding

GENERAL
3.1

Late receipt of FY 1958 PAC and mis-

cellaneous construction funds resulted in

facilities were taxed to capacity throughout the
EPG. Additional billeting space was provided by
use of eight-man tents at Site Elm«r. and tents

the postponement of 43 of the 130 authorized

were utilized for housing at all off-island camps.

quired to support the test program were com-

ENGINEERING

construction projects until after the completion
of Operation HARDTACK. Critical facilities re-

pleted prior to the start of the operational period.
These included the erection of additional bar-

racks facilities on Site Elmer (see Fig. 3-2),
extensions of the Site Fred runway (see Figs.
3-3 and 3-4), and additional aircraft parking aprons, and the augmentation of the base
power facilities by use of portable generators

3.2

H&N, the AEC’s A-E-C-M Contractor,
performed all design and engineering of
the facilities and structures added to the permanent base during FY’s 57 and 58 at its Los
Angeles Office. The Chief, Los Angeles Branch,

AEC, approved finalized drawings and specifi-

cations. Field revisions and engineering changes

horrowed from the U. S. Navy. To conserve real

were made at EPG and approved by the AEC
Eniwetok Branch engineering staff.

capable of billeting 128 men. To improve efficiency in communications. a 600-line dial tele-

CONSTRUCTION

estate, four 2-story barracks were constructed
of concrete and prefabricated aluminum, each

phone system was installed on Site Elmer and

a smaller automatic dial system was installed
on Site Fred. Additions to the salt water fire
protection system were made to provide ade-

New

PAC

construction generally was

hampered bya shortageof materials, most-

ly metal products which normally require a long

lead-time, and skilled labor which was utilized for
scientific construction. An interesting addition
to the base facilities on Site Elmer was the con-

GENEIDENTIAL2

ne

Page 42

7m

wf

quate fire protection to the facilities at Sites
Elmer and Fred. Despite the increased plant,

3.3

nfHehlCnfnermlmlhltTtNnlhlmlClCThlCrhlUCODrlClCTDUlCDelUCTUlUCFVUlUCWWlCFWPUCUCFWClClCFWmCDVmlmUCOlUlmlCUDmlCOPMmCPHLCUCOPHOCH

(W-V-296-2) .

fF

Figure 3-2. Four 2-story Barracks, Site Elmer.

f©B

ry

OCHO

CU

gl

ary

PART III, CHAPTER 3