ot

TABLE 3.1 - Pressures and Positive Phase Duraticn Times

at Project 3.3 Stations, Shots 1 and 3

—

=
Station
Number 2|

——

round
Range

(ft)

4

a

ete
ere
roowrtenereeern
5

Feak Static
|Positive : Phase|PeakDynamic
Pressure
|
Duration
Overpressure

(psi)

(sec)

(psi)

Shot 1

P.22

61,710

2.5 >

10.0 ©

--

p-21

62,500

2.4 >

10.0 >

a+

P-13

75,400

1.7 >

12.0 >

--

Shot 3

8,040

4.70 ©

1.46 ©

P-1

8,200

4.50

1.16

0.9

P-8

8,340

4.52

1.47

--

P-3

8,800

nr 4

--

--

122.21 ©

9 , 380

4.12

1.61

=

P-5

9,400

4.19 £

--

2.3

P-20

9,840

3.98

--

--

P-7

10,000

4 07

--

--

P-13

10,440

3.20

--

--

P-21

28,430

0.79 f

e-

0.5

P-22

31,310

--

wn

--

“nd

Tr

co

w
“=
2

int

ne!

amt

~

tN

See Figs. 2.2 and 2.3 for gage locations.
Values furnished by Program 1, gages not activated.
Average of two gages.
No record obtained.
BRL free field measurements, adjacent to tree stand.
5 gages.
From dynamic pressure gage.

ry

Lac)

&
b
€
a4
€

P-14

--

Average of

|

Select target paragraph3