Reproducedfrom holdingsof the Natioual Archives Pacific Southwest Region wt ASE B84 Resident Engineer JS Chief Project Engineer Building 419 - Gantry Crane March 1, 1954 With reference to your memorandum No. 08 7539 dated February 12, 1954, the Crane Hoist Engineering Corp. has been contacted and we are attaching a copy of their letter outiining their re¢on- mendations, As mentioned in a previous teletype, a spare load brake has been ordered and will be used to replace the existing load brake in the gantry erane, Since these load brakes are interehangeable with brakes furnished on similar equipment by the Crane Hoist Engineering Corp., this solution will provide the jobsite with a spare unit to fake care of future fatlures should they oecur. Gripin-! signed by H.L. DIETZE . . Narver, ar. Chief Project Engineer DLNJr sHLDreas Ene, 1 ces: Project Manager d8 Constr.-Oper, Div. Project Engineering 751 Mail Room (2) ? (2) File MAT OPAL. ARCHIVE. REPOSITORY ~L4c/F16 Sov SeiT REGION COLLECTION KE 346 ATOMIC _ENEREY COMMISSION BOX No. £29624 (#603) 4/6334 326-65v2/70 . ELMER GENERAL ,; FOLDER 323 384 PROTECT ENGINEERING FILE BEST COPY AVAILABLE Rk.