Resident Engineer JS

Chief Project Engineer

Building 419 - Gantry Crane

March 1, 1954

With reference to your memorandum No. 08 7539 dated February 12,
1954, the Crane Hoist Engineering Corp. has been contacted and
we are attaching a copy of their letter outiining their re¢on-

mendations, As mentioned in a previous teletype, a spare load
brake has been ordered and will be used to replace the existing
load brake in the gantry erane, Since these load brakes are
interehangeable with
brakes furnished on similar equipment by
the Crane Hoist Engineering Corp., this solution will provide
the jobsite with a spare unit to fake care of future fatlures
should they oecur.

Gripin-! signed by

H.L. DIETZE .

. Narver, ar.
Chief Project Engineer

DLNJr sHLDreas

Ene, 1

ces:

Project Manager d8

Constr.-Oper, Div.

Project Engineering

751 Mail Room (2)

?

(2)

File

MAT OPAL.

ARCHIVE.

REPOSITORY ~L4c/F16 Sov SeiT REGION

COLLECTION KE 346 ATOMIC _ENEREY COMMISSION
BOX No. £29624 (#603) 4/6334 326-65v2/70

. ELMER GENERAL
,;
FOLDER 323 384 PROTECT ENGINEERING FILE

BEST COPY AVAILABLE

Rk.

Select target paragraph3