QUESTIONS AND COMMENTS - SUMMARY OF COSTS NORTHERN MARSHALL ISLANDS RADIOLOGICAL SURVEY 1. AERIAL - None 2. GROUND Terrestrial - Ground monitoring surveys are not included. - Soil profile samples, necessary for plant uptfake studies are not - Personnel salaries are not stated as being included. included in the minimum figure. Marine - Personnel salaries are not included. CONTRACTORS - BNL 189 received and costs shown. It is not kn BNL costs are factored into the LLL estimates sh whether — for terrestrial. - Is whole body counting of the No. Marshallese desired? are shown. - 189's not available for Univ. of Wash., and EPA. It is not known whether their costs are factored into the HLL estimates for No costs “Terrestrial” and "Marine". CONTINGENCY Since only the minimum options are listed for the ''T irrestrial" and "Marine" programs, the possibility exists for modifi rations of these costs in the upward direction. Have all salary costs been included? Have all analytical costs been included? FY 1980 Costs - In view of past experience, funds will be neces: ry to continue should be budgeted sample analysis into FY 1980. Approximately 30 for this period. - Have all costs for the final report preparation jbeen included?