|

én

sda _stasoeen

acustininagane

~~

a

Navy Project Manager for coordination and execut ibn of DOD
responsibilities for rendering logistics support

o this

survey is Commander, Pacific Missile Test Center

Pt. Mugu,

California.
a.

PHASE I.

Initially, a photographic surv y of eleven

(11) atolls and two

(2)

islands in the Northern

arshall

+

This platform has been specially configured to r Eceive DOEprovided high resolution and infra-red capable c Ameras, plus

*

a eit nate destin

”~

.

Islands will be accomplished utilizing a DON EC- L2l1 aircraft.

additional peripheral support equipment.
(1)

Phase I will be accomplished under the operational

direction of the Project Manager (COMPMTC), in 4d ecordance with
the technical direction and advice of the on-si/j le DOE representative and the terms of this MOA.

(2)

COMPMTC will promulgate an approprfate Operations

Order for the accomplishment of the Phase I misBion.

b.

PHASE II.

Utilizing data gathered fro

photographic survey, an
(11)

atolls and two

(2)

the foregoing

Aerial Radiological Survey of eleven
islands will be conducitfed by means of

SH-3G helicopters equipped with DOE-provided rddiation detection
and recording instrumentation.
operate from USNS WHEELING

The helicopter

will normally

(TAGM-8), a base support ship which

will, in addition, provide a wide range of logkstics support.
Flying relatively precise tracks at specified Altitudes and
air speeds, the data collected will be reducedJ

and result in

Select target paragraph3