Order number page 60 940406-165953-13 -001-001 set 5 wi th 341 of 341 items bursts of an XW-51 warhead are computed. 801. Item KEYWORD (S) (U) 1 reference. 121 150. REPORT NUMBER SC--3750 (PR) 110. PRIMARY TITLE (M) Monthly report November 1955 710. CORPORATE SOURCE Sandia Corp., Albuquerque, NM (USA) 371. PUB. DATE (YYMMDD ) jdate 34. CLASSIF. LEVEL T EXT Secret 950. ABSTRACT The publication outlines the progress of Sandia Corporation research and development organizations for November 1955 in the atomic weapon program. Among items discussed are: (feasibility of developing tactical or laydown bombs with yields of 10, 40, 100, and 1000 kt; (2) the feasibility of fitting Class B, C, and D warheads in the B-58 (HUSTLER); (3) the feasibility of suspending nuclear test devices from captive balloons during full-scale continental atomic tests; (4) a proposal to fuze the ATLAS warhead using a baroswitch to provide airburst and piezoelectric crystals to achieve ground-burst; (5) a proposal to simplify the fuzes used in the Mk 7 and Mk 12 bombs to attain an interim tactical bomb capability until the TX-28 tactical bomb is available; (6) discussion of two new high-yield 801. KEYWORD(S) weapons, the TX-36 and XW-37; (7) development of new thermal batteries for the XW-31 (NIKE B) and the TX-28. ATOMIC WEAPONS/;LAYDOWN WEAPONS/; REDWING/; ATLAS/fuzing systems-wd ;WEAPON 07/fuzing systems-wd ; WEAPON 12/fuzing systems-wd ;WEAPON 36 TEST DEVICES/; WEAPON 31 TEST DEVICES/;WEAPON 31/;WEAPON 28 TEST DEVICES/;ATOMIC WARHEAD INSTALLATIONS; ATOMIC WARHEADS; REDWING; TELEMETRY; THERMAL BATTERIES ; THERMONUCLEAR WEAPONS; AIRPLANE B-58;BALLOONS; ATLAS; BARO SWITCHES; NIKE-HERCULES; ATOMIC WEAPON DELIVERY Item 122 150. REPORT NUMBER SC--3709 (PR) 110. PRIMARY TITLE (M) Monthly report, July 1955 710. CORPORATE SOURCE Sandia Corp., Albuquerque, NM (USA) 371. PUB. DATE (YYMMDD) jdate 34. CLASSIF. LEVEL TEXT Secret 950. ABSTRACT This publication outlines the progress of Sandia Corporation research and development organizations for July 1955 in the atomic weapons program. Among items discussed are: (1) completion of operational suitability tests of the Mk 5/MATADOR warhead; 9003251 (2) approval by