FY 1980 BUDGET

.
“Holmes & Narver, Inc.

Pacific Test Division

Contractor
10,1

Funslings Detnil

DIRECT

.

|

“Us 8s DEPARTMENT OF ENERGY

‘PACIFIC AREA SUPPORT OFFICE
ADDITIONAL EXPLANATION FOR OPERATING COSTS

RESEARCH AND DEVELOPMENT AND PROCESS DEVELOPMENT ACTIVITIES

—

,
February 15, 1978

Date:

Schedule 189

.

.

FY 1978

.

:

.

FY 1979

Page 2 of 4

Fy 19 80

vs

Salaries
Fringes
~ Subsotal

0

0

0

0

Other Direct

400.0

800.0

TOTAL

0

0

6

0

0

&

400.0

800.0

Travel Subsistence

mA

INDIRECT

.

"

<

TOTAL OPERATING COSTS

It. Scopes (To be weltcen by principal Investigator «approximately 400 words)

©.

_

one.

61%.0

a

GYS<0.
”

The POE controlled veasel, LCU-26, RV Liktanur was damaged by rough acas in October 1977 and declared

unfit for further open sca travel,

This vessel supported four trips throughout the northern Marshalls

for the frookhaven National Laboratory medical program, plue seven additional trips to support LLL,
Univ. of Hawaii, Univ. of Wash. and BNL programs dealing with cycling characteristics of radionuclides.
The FY 1978 schedule called for 240 sailing days to support this effort.

A search is underway to locate, acquire and refit a similar type vessel in order that long term programs
may maintain necessary continuity.
Following are general assumptions which povern the budget cstimate,
1.

A comparable dedicated vessel is requircd,

‘

2.

The vessel will be located in FY 1978 in time for modifications to be made carly in FY 1979.

Select target paragraph3