J3~228

Joint Task Force Seven,

Group 7.1.

Task

SCHEDULE OF PARTICIPATION IN

REDWING,

(REVISION NO. 1 TO

1, Redwing

I, Kerwin, WT

II, Joint Task Force

Seven, Task Group

REDWING PARTICIPATION).

Kerwin, WT

7.1

Oct. 13, 1955
13p.

2 le LS
J3-H-1l

4

(Report: CONFIDENTIAL)

Joint Task Force Seven.

Task Group 7.1

CTG 7.1 OPERATION ORDER 2-56 (INTERIM
PHASE). TASK ORGANIZATION. Gaelen Felt.

August 2C, 1956.

5p.

l. Redwing

2.
3.

4.

I.
II.

Pilgrim
Hardtack

Joint Task Force

Seven.

71

Task Group

Personal Author
Corporate Author

po./. fa/
3210-549
(Report: SECRET)
Cd: UNCLASSIFIED
los Alamos Scientific Lab., New Mexico
1.
FIREBALL YIELDS REDWING.
lI.

Joseph F. Mullaney.
8p.

August 17, 1959.

1.

Authors (6)
Corp. Auth.

Redwine

Work done by: Leroy N. Blumberg, lobert.
D. Cowan, Louis Gatt, Herman Hoerlin,

Thomas L. Jordan, JI., Joseph F. Mullaney.

2-2-67

Ng

7

pet

.

244

Select target paragraph3