April 2, 1958
W. B. REYNOLDS
LS
| WBH
lyon
SUBJECT:
mia
L Visited Cooper Development Corporation on March 27, 1958.
MLM
iM
&C
Subcontract 108 - Cooper Development Corporation
.
Cooper continues to
be exerting an all-out effort to meet technical specifications and furnish hard-~
ware on schedule. Apparently all materials have been ordered or can be obtained
within the remaining time. The Cooper shops and their suppliers are on Schedule. .
_
B. F. Goodrich will be able to load RIV rounds in ‘time.
occurred on March 21, 1958 at B. F. Goodrich.
:
ae ae
A successful static ‘firing |
Apparently all RIV motors will have
Return to UCFtO be moved by air to EPG. To expedite and insure delivery, Cooper vehicles wil
149 Bldg. S0deliver RIV motors to Travis.
”
Eight rounds have beentest ‘fired to date._ Subject to.the availabilityof funds©
po 7amd time, four more rounds are planned;- namely, two at White Sands » one on April 3 |
ass
and one on possibly April 10, and'two;for the week of April 8at Point Magu.:
het
te
is studying the fundss availableAu.view of these extratests which-eppear.