4. (a) To be done in ZI by the same organization responsible for the collection. (b) General analysis for total fission products. (c) Specific assay for Pu, Sr, Y, Ru, Ce, Nb, Zr, Pr, I, and/or others that may be detectable. F. Logistics 1. Transport from ZI to PPG. {a) Air transport for necessary personnel - one or two round trips per month for an estimated 6 months for probably not more than four people. (b) 2. * e Air transport of samples to ZI, probably not over 200 lbs. per month. Support at PPG. (a) _(b) Liaison with ABC, EFO, and H&N. One LCU or LST required to transport initial load of equipment and provisions. (c) Rongelaap equipment. 1) Camp facilities adequate for 8 men. 2) One DUKW and driver. 3) One LOM and crew. 4) One large rubber raft. 5) One boat with power, comparable in size to whale boat but faster than LOM. 6) The level of contamination on Rongeleap Island may be high enough to prevent use of a camp on the island, In this case, a boat of some sort (ICU) with adequate living conditions to COPIED/DOE LANL RG Sleep and feed & people would be necessary. ~L- '