Reproducedfrom theholdings¢ofthe
Natiouat Archives |
P
southwest. Re
oot
ata
cS

Contract
Item No.

A~2l
Aw-21,1

Shy

description a

“Electrical Facilities (Tare)
«Extension to West end of Camp (Tare) 6/11,/53

A~21,2
A=21.3

Aw21 hh

A~21.5
A=22

A=2242

-Telephone Distribution (Tare)
860-3790y-Amendment-1-(Bare}-6/2/53
“Additional Telephoe Distribution - EWO 3176

A=~23

-Water Distribution (Tare)

Aw22.1

An22,3
Aw22
- Am22.5
A~-23,1
Aw-23.2

A=2343
A@23.4

= |

A=2)y

-Fuel O11 Facilities at Plier (Tare)

An23.5
A~2), 61

Aw2h,.2
A~2h,.3

A~2h

Am21,.5

A=25

A~25.1

A-2542

“Airstrip & Accesa Roads (Tare)
-=

A=25 3
Aw25
A~25 5

A=26
A=-26.1

-~Causeway

A=26,.2
A~26 3

A=26.);

A=26 5

A~27
A~27 wi

A=27 22
A~-27..3
A=27 oh
A~27.5

Scientific Structures (All Sites)

Remarks

App. C, Mod. 16
ba

Select target paragraph3