a
SECTION V1
HETURN TO DOENV TECHNICAL INFORM
RESOURCE CENTER
VEHICLES AND SUPPORT EQUIPMENT
-l
GENERAL
This section contains the Post-GO requirements of vehicles and
support equipment as reported by the Using Agencies involved in
nuclear testing in the Pacific Operational Area.
2
SUMMARY OF TABLES
The vehicles and support equipment required are presented in
the following tables:
TABLE
TITLE
PAGE
TABLE 6-1
Requirements Summary
6-3
TABLE 6-2
Summary of Each User's Requirements
6-7
TABLE 6-3
Summary of Requirements at Major
6-13
TABLE 6-4
Requirements at All Locations by User
6-18
Locations
The data in these tables are presented as follows:
GO+N
ITEM
Xx/Y
Max.
M
ITEM identifies the vehicle or equipment.
Nis the GO+ date of the requirement.
X
OnN day the requirement for this item is increased by X or
decreased by (X).
Y
Running total requirement for this item.
M
Maximum number of this item required.
NOTE:
The requirements of JTG 8.5 and JTG 8.6 are not includ-
ed in this section.
later date.
Such requirements will be added ata
QUMENDBEGS
6-1
4
VOL Il