Rl
wt
LIST of EVENTS on BOARD USS GRASP (ARS-24) for WAHOO
DATE:
Wel day (15 May)
TIE
ITEM
0530
The following personnel boarded the USS GRASP (ARS~24),
A total of 15 people,
Burton, Project 34.3
Jacob, Project 34.3
Hainds, Project 34.3
Hamilton Project 34.3
Crosby, Project 34.3
McCarpbell, Project 34.3
Fort, TU~5
Hudgens, Project 34.3
Long, Project 34.3
LCDR Johnson, J-3
Robinson, YN2, J~3
Dickens, Project 1,11
Taylor,
Preject 1.11
Skinner, Project 1,11
Fors, Project 1,11
0755
USS GRASP moors to zero buoy.
0800
USS MONTICELI.C arrived on scene and discharged boats,
0830
IC! #1 alongside
O945
Connected 4" line between GRASP and YC,
0950
Project 1.12 barge lying off under tow; will be brought alongside when
weather permits
1000
Attached timing cable to LCM #1
1000
Commenced firet WAHOCO count down
1005
Cornimenced streaming of LCM #1
2045
‘
-
{
COMMISSION
L-eat’or
Transferred two H&N radiomer. back to ISD via LCN.
a3
\
lector
st
CoteetonRecord.sCater
FolderJ* 3 Ernie °o
Daily Derg (Hardtack)
!
t™
1045
Project 1.11 barge secured alongside
1100
First Dry Run completed; successful
1115
Project 1.11 barge alongside being swamped by seas, project personnel unable
to go aboard, Equinment on topside completed awash, Mr. Dickens of Project
received concurrance from CAPT Mendenhall (aboard EC-2) to return barge to
LSD and remove the sand ballast.
LSD,
LCM #21 ordered to GRASP to tow barge to
The 1100 Dry Signal Run was successful for Project 34.3 and EG&G.
unable to participate.
Project 1.11 ua
Project 1.11 personnel transferred to USS MONTICELLO via LSM #21 with barge
in tow. Personnel included: 1. Dickens; 2. Skinner 3. Fors & l. Taylor.
New zero hour changed to 2215,
Project 1.11 barge being toved by LCK to ISD.
COPIED/DOE
LANL Re