DATE:
Weday (cont'd) —
RG
TIME
0850
Starting to lower weapon.
0852
Rigging the Project 1,11 reel
0853
Commence praying out Timing Cable.
0900
Yoshitake arrived via AVR from TG 7.4 Docurentary Photo Unit.
326 LS ATOMIC ENERGY
COM Moti
Location
9B NL F238 \33
Cobcclic:
-
Ss Conte
;
Folder\-3 Ernnwetok
al
.
\
Har: toe k
a
0900 Weather Rerort: Winds - 15 knots, 075°(T)
Seas
-
4
ft.
0°03
Weapon lowered 100 ft.
0910
Weapon lowered 250 ft, °
0915
Wearon lowered 325 ft.
0930
Weapon lowered and now connecting Project 1.11 instrumentation cable to
Project 1,11 barre.
0930 Weather Report: Winds - 16 knots, 070°(T)
Seas - none riven
O94S
Cormence connecting Project 1.11 barge betweer ship and buoy
1000
Project 1,11 barge in position.
1005
Disconnected from zero buoy; GRASP underway.
1022
AYR departed to Project 1,11 barge with LCDR Johnson, Hamilton and McCampbell.
1030
CTG 7.1 gave permission to arm.
Underway to assigned operating area for shot.
AVR pickad up 3 Project 1.11 men from barge; and delivered to GRASP.
returned to LCM #1 to await evacuation of Arming Party.
1215
Purton informed CTG 7.1 that arming was comrleted.
1225
AVR departs zero barge to Elmer with arming party aboard,
1330
detonation.
1830
USS GRASP uncerway to Elmer.
1930
Requested permission from Col Lucke tosecure.
GRASP via LCM to personnel pier Elmer,
/ me
Ny‘ibe
-_
AVR
New zero time set for 1330.
Secured station and left
/(