COST AND CLEANUP METHODOLOGY

LOCATION

AREA(FT?)

METHOD

903 AREA

266,000

REMOVED TOP THREE $ 30,00

COST

INCHES INTO

CENTRAL AREA

1969

PAD

170,000

(903 AREA)

AREA COVERED WITH $100,000
10 INCHES FILL

MATERIAL AND 3
INCHES ASPHALT

1976

Lip

7,750

MANUAL EXCA-

$ 43,500

VATION IN

(903 AREA)

FLOORLESS BLDG,

1977

1978

POND-AREA

FRONT-END LOADER $327,000

(207 SOLAR

EXCAVATION OF

PONDS)

MOISTENED MATERIAL

OIL BURNING
PIT

1978

38,950

Lip
(903 AREA)

2,000

FRONT END Loaper $101,000

(5 Foot

EXCAVATION OF

DEEP)

MOISTENED SOIL

45,500

FRONT Enp Loader $410,000
EXCAVATION OF
MOISTENED SOIL

Select target paragraph3