SEPTEMBER 1968
PRELIMINARY PROPOSAL FOR CONTAINMENT COVER
WAS PREPARED BY RocKY FLATS ENGINEERING.

JULY 1969
FIRST CoAT OF FiLt MATERIAL WAS APPLIED.

AUGUST 1969
FILL WoRK WAS COMPLETED, PAVING CONTRACT
WAS LET.

SEPTEMBER 1969
OVERLAY MATERIAL, SOIL STERILANT AND
ASPHALT PRIME CoAT WERE COMPLETED.

NOVEMBER 1969
ASPHALT CONTAINMENT COVER WAS COMPLETED.

FouR SAMPLING WELLS Were INSTALLED.