wee,
(2)
All parties entering a contaminated area shall be briefed
at the Rad-Safety Building, Site Elmer, and/or Site Nan,
prior to being cleared for access to a specific area.
A
situation map showing the results of a radex survey will
be used.
(3)
All parties entering a full radex area (greater than 100
mr/hr) will be required to have a certified monitor
accompany them.
(4)
Construction and support activities in contaminated areas
will be accomplished at the discretion of the AEC Branch
Chief.
The AERC Rad-Safety Assistant will act as an advisor .
when required.
Rad-Safety Clothing and Equipment
The procedures outlined in paragraph 5e also apply during the
non-test period,
Decontamination
All persons leaving a contaminated area will be monitored for
contamination.
Persons found contaminated will be processed
through the personnel decontamination station Site Elmer and/
or Site Nan.
Equipment found to be contaminated will be decon-
taminated when the radiation levels are greater than those values
-15-