devices desired, which was ip turn partially dependent upon certain
diagnostic information from the Nevada UPSHOT/KNOTHOLE series in the

Spring of 1953.
bd.

Having determined the design or model to be followed, production

capabilities on certain critical materials appeared to be another
Limiting factor affecting specific dates.
c.

Bomb site locations:

with the advent of shots such as GEOBGE

(GREENHOUSE) and particularly MIKE (IVY) it was realized that careful
consideration must be given to the bomb site locations in the Forward
Area.

The primary concern was the residual radiological effects which

might,post CASTLE Operations.

The utilization of barges appeared to

be one means of alleviating some of the radiological problems, but
until after CASTLE experiments its effectiveness will not really be
known.
a.

|

The detonation of the device:

Only after the location and probable

yields are settled can it be determined whether or not the device
should be fired by a radio circuit or a direct circuit, and whether
or not television is essential to support the firing systex.
e.

Diagnostic measurements desired:

;

Theoreticians cannot, ‘except tor

_ standard experiments, determine the desired diagnostic experiments
until designs become firm.

The failure of early agreement on these

experiments in turn delays critical construction in the Forward Area.

These experiments may well dictate such thin
complex block houses, etc.
D.

February-May 1953:

1. The factors enumerated above are those
However, in spite of not knowing the

SN

as to scope and specific schedules.