J3~DDH-E87

9 May 1958

device from thé GRASP to the CMR Compound and for Marine Dept (HEN) to tow
the zero site LCM from the USS MONTICELLO (LSD-35) to within the "L" at the
deep-water pier so that work can progress tonight and tomorrow. (JHW)
ce. This B-l cay, F-l day,K~2 days and S-7 days, A WAHOO rehearsal is uncerway
which is scheculed to include positioning of a dvmmy device at the SZ buoy;
a full power run at 11COM; a regular dry rur et 1300 and a special run at

1420. (JE)

d, A KOA Gry run was completed at 1000M,

zero time of 1115é.

(JEW)

A BUTIZRUT dry run was scheduled for

e. CTG 7.3 priority confidential ressage to CNO changes USS BONITA (ssK-3)
participation in WAHOO event due to strong wincs and heavy seas constituting
personnel hazard end possible loss of BONITA.

12,600 feet bearin
heacing 040 T.

Coat

VENICLES AID TRLILERS:
a,

Vehicles up-island as of this dete :
Yvonne
3 - Jeeps
Janet
2 - Jeeps
2 - Weapons Carriers

1 - Trailer (J-13~-3)

Gene-elen-Irene

6 = Jeeps

4 - Vleapons Carriers

3 - Treilers (J-15-3, J-7-1, and W-7) (JDT)

b.

At 1140%, COR Wendell telked with Jim Williams (J-3 Janet) on this
subject ancd he reports thet the project personnel want to leave their

equiprent in place during PUTTERUT and evacuate on K-1.

(J!)

1 Inel

Racex Reading CAGTUS - 9 May 1958

DISTRTEUTION:

ae

i- Wh (Lucke )

(Curry)
11 -= D/A
J-3 (Gattis)

(BIKIT)

TA

VY

is

ST

PRE

fet

Teh

WM
2
EHP 273.
RGS

oy

5.

Intend to place DSCNITA at

ay T from SZ, at periscope Cepth, steerage-way,

Select target paragraph3