‘
.
WORK AUTHORIZATION
ft 4059a9
5765.
U.S. ATOMIC ENERGY COMMISSION i —~“Sarfal
Number
| ContiactAT-(29-21-20
=
3
Pacific Southwest Region |
PACIFIC PROVING GROUND
STON/MANRTENANCE
HEN WOak ORDER NO.
|
STATICN «3440.02
Job Folder No__S2tPeA
.
H&N IDENTIFICATION NOWeel
4.
LOCATION
OTH
bate issuco.2/18/58__ate requinep__ASAP Ss prioniry___ ORAL
_
REQUESTED BY
COST CODE (H2NJ____._ACTION 6Y
|
TASK GROUP_____PROJECT
APPLICABLE seawnosa-Dauae
ioe
Aj SSGBiGEaa
1/5
ndSOSH
ew _
J/S 48-3440,01 Rev As
/haf.) (ee
DETAIL OF WORK TO BE PERFORMED
Furnish labor, material and equipment to accomplish work for Serobarograph
Station 3440,02, \.CTHO, as detailed on referenced drawings.
Applicable: sub-accounte:
600 Slectrical
710 Zlectrical Util Sys
Rifmy LEP
S/LE/hH
BEST COPY AVAILABLE
All labor, material, installed eauipmont, equipment usage, concrete, and aggregate used in the performance of
this worl must be reported under this Work Order Mumocr, with the dascription af the work porformed In
accordance with pages 3 end 14 thru 19 of the Moines & Nearver Foreman's Handbook.
(4, )
Chronological
AEC Resident Engineer )
User
+ (
}
J6 (4)
(2.
SEFICIAL
heporter
gly
Test Lab
cl;
(5)
PropertySection 1)
services1)
Spucial
Bt
{2)
inspection
Project Engineer - 4.0._-____.___{1 )
Comminicztions
aurvey
astimating
ot
vesim
(4;
5
SafetyMngineerty
GEG us.
Service Operations Division
}
Profect Controlier - H.Os- i)
Supply Division
(2!
Accounting Division_______{8}
oe op zTr em e
Construction Division.______(30
1
“ou
Project Manager ~ 4.8;
PESt
Engineering Division____._.___{&, }
“een
NOM
Dat
10/30/5a
*~
11/30/5747
Narver Approval
a
Sgnd dwgs
KC fmens
Holmes &
ee
DISTRIBUTION:
eh i gee
A.E.C. Ausharization
ae
Date
i
fogrr
oh ase
Task Group Approval |
for
}