BIOMEDICAL & ENVIRONMENTAL RESEARCH
FY 1976, FY 1976A, AND FY 1977 PROGRAM ASSUMPTIONS

.

18 Feb 75

-2403668

Bioenvironmental Transport of Transuranic
Elements - EPA

110K

The project initiated by EPA to study the bioloqical uptake,

physiological transport, tissue retention and rates of
excretion for the transuranic nuclides in large animals will
continue at the FY 1975 levels. A budget schedule 189 will
be required for this activity.

DBER Program Logistical Support BEST AVAILABLE COPY
REECo
CSC

80K
5K

REECo and CSC will continue to provide logistical and computer support to DBER programs conducted at the NTS. Program

and support levels are expected to anproximate that of FY 1975.

Mid-Pacific Marine Laboratory - Univ/Hawaii

$ 585K
166K ——

The Mid-Pacific Marine Laboratory (MPML) will continue to be
operated by the University of Hawaii. This cateaory provides
for the operation of the Laboratory at Enewetak includina a
director, an on-site manager and assistant, and a full-time
researcher. The program also provides for travel and other
logistical support to other researchers who have projects
approved for investigation at Enewetak. A budget schedule
189 is required for this activity.

Hydrochemistry of Enewetak Atoll - Univ/Hawaii

54K

The University will continue to study the hydrochemistry of
Enewetak under the guidance of Dr. Robert W. Buddemeier. A
budget schedule 189 is required for this project.
Toxicity Levels in Enewetak Fish Population Univ/Hawaii

60K _—

The studies of toxicity in Enewetak fish population will be
studied under the direction of Dr. Albert H. Banner. A budget schedule 189 is required for this project.
LCU Operations - H&N/PTD

305K

~~

Holmes and Narver will continue to reimburse the U. S. Army
for use of an LCU based at Kwajalein. The estimates should
assume that user organizations will reimburse H&N for food
while their personnel are on the LCU and for other support
such as transportation of personnel and freiaht to an from
Hawaii. The estimates should be submitted in enough detail

to permit understanding of the schedule and related costs.

3

90D/

RX-02-02 Marine Scfences

Select target paragraph3