eo & ms i . \ : lla Noy, _ sc ~37~ effectively to manage and evaluate the programs of research carried out in the National Laboratories. (Appendix B, item 3) At 2:00 p.m, the Committee met with Mr. Strauss, Mr. Murrey,Mr, Campbell, Dr. Smyth, Mr. Zuckert, Mr. Nichols, Mr, Walter Williams, Meeting with the Commissioners and Mr. John Mackenzie, All members of the Committee and the Secretary were present, and General Manager Dr. Rabi began by commenting in strongly favorable ‘terms on the Joe-h, 5, briefing on Joe-4, 5, 6, and Te 6, and 7 He then referred to the Comnittes's Improvements in Chemical HE { field. On behalf of the GAC he recommended very strongly that the AEC set up research, and, if found needed, facilities for improving HE and — discovering new explosive materials. (Appendix B, item 1) Dr. Rabi next mentioned that the GAC intended to study the ‘problem Larger Thermonuclear Weapons rive--Year Plan of maximizing the yield of the weapon which can be carried by existing airplanes (up to 50,000 1b). Next, he mentioned the briefing from Dr. Hafstad on the five-year plan. He indicated that Mr. Whitman was the new Chairman of the Reactor Subcommittee, replacing Mr, Murphree, and called on Mr. Whitman to comment on the briefing. prep2red. Mr. Whitman read the statement which he had (Appendix B, item 2) Sor Department of Energy Histerian’S Ciffcg os ARHIRES G2

Select target paragraph3