-]l-

NORTHERN MARSHALLS PHOTO MISSIONS
Eleven Atolls + Two Islands

(Conducted separately)
Assumptions:
1.
2.

Personnel and equipment will use commercial

KWAJALEIN ATOLL.

jir to

Photo missions will be flown by fixed winged aircraft
from KWAJALEIN ATOLL beginning at least three weeks

before the beginning of the radiological survey.J*
3.

Aerial photos are to be obtained for those atoll
listed in Table I.

4.

Film will be processed at both KWAJALEIN AYOLL and

5.

For commercial logistics of photo missions seg

Las Vegas, Nevada.

ESTIMATES, "'

- Requirements:

i.

2

and islands

"COST

BEST AVAILABLE COPY

One C-54 aircraft plus crew, or, an aircraft

with equivalent

range to fly photo missions to those atolls and
in Table I. See Schedule Il] showing a period
complete photo missions.

jslands shown
30-day to

Finished photos suitable for planning each of the

three parts

of the aerial radiological survey must be available prior to the

beginning of each part.

3.

For photo missions, the following personnel arp the minimum
to be used:
3-persons flying with cameras.
1-person at KWAJALEIN ATOLL processing
"tails" to insure good results

DOE ARCHIVES

*This assumption rests on the additional assumption that
C-54
aircraft is used since hardware for mounting cameras is Bvailable.
For any aircraft where mounting hardware must be fabridated, this

fabrication will take two to four weeks.
——

2/3

Select target paragraph3