-2-
Requirements:
1.
For the survey of eleven atolls and two islands
a.
Two helicopters that are operational, associatkd crews and
support personnel, and a ship to operate out of KWAJALEIN ~
ATOLL for a minimum period of 70 days.
b.
Seq
Schedule I.
Two small boats to put survey personnel ashowe on selected
islands to emplace ground based navigational
dids, to collect
samples of soil, fish, and vegetation, to makef portable
instrument measurements, and to collect samples of food
on inhabited islands.
c.
For the radiological survey the following perspnnel will be
the minimum to be used:
9-persons with aerial instruments and asdociated
ground support crew.
1l-persons performing ground survey and
collection.
sample
For the survey of BIKINI ATOLL Only:
3.
4
<A base camp established on ENYU ISLANDorJship anchored
nearby to support helicopter operations.
b.
Two helicopters and crews to operate at BI
1§ days. See Schedule I.
¢.
Personnel requirements are the same as in
ATOLLfor
part lc above.
For either survey option, see Table Il for atolls afd areas to
be covered and their priorities, and Table Ill for
of priorities assigned.
qxplanation
Table IV shows routes to be taken for the three part survey of
eleven atolls and two islands (two crew changes arg
one resupply
stop for the ship), and for BIKINI ATOLL ONLY.
DOE ARCHIVES
For requirements for photo missions conducted s arately, see
"NORTHERN MARSHALLS PHOTO MISSIONS" an "SCHEDULE
i.*' For requirements for photo missions for th BIKINI ATOLL
Only survey, see ''SCHEDULE II",
ee mee
5.
a.
199