Dr. Robert A. Conard

«2-

June 25, 1969

The lead brick for the facility is at Bikini and will be left in the
bunker on Bikini unless directed otherwise.
The planning estimate for constructing the facility on Bikini Island
as shown on drawing No. SK-7.P1 is $6,000. This is based ona

contractor being present on Bikini at the time this work is initiated.
Very truly yours,

Original Signed by
W B. HILLS

William A. Bonnet

HOA-.949

Manager

Attachments:
1 - Dwg. SK-7. Pl
i

-

Dwg.

SK.6

1 - Dwg. SK-9
cc: J. W. Merrill, Bikini Atoll w/attach

R. E. Miller, Mgr., NVOO w/attach

w/attach

G1 025cag

Dr. John R. Totter, Wash., D.C.

OFFICE ®

| 88 nn fen ee ef eee ee een fee eee ee eee

SURNAME B®

088 eee nee renee ene eee eee eee ee eee een eee ee

oe
Form AEC-8

:

DATE mp |
‘

0 | cee cee el ec ce eee eee ee eee eee

>) RBY

18 (Rev.

3

15 GOVERNMENT PRUNING OFFICE 1966 OG 214 6 9

Select target paragraph3