BLDG, NO.

541 -M
54° ~M
M
34,
544 -

545

546

548

15tv2got

2é,'x1201

Roefer Shelter
Cyvuerater Shed

Wood on Elevated Fdn.-Metal Roof

Storage

Tool Shed

Wood w/conerete floor
Metal

Wood with metal roof (Demolished)
Wood Frame w/corrugated metal

Wood on Wood Blocks
Wood Frame - Corrugated Metal covered

Wood & Corr. Metal, Wood Floor
Wood & Corrugated Metal

135 'x260!
100 'x150'
32%50!

Decontamination Fad
Decontamination Ped
Jet Deflector Pad

Wood & Corr, Metal on Skids
Conorete Sigb
2 Sided Wood Wall - Metal Roof
Slab
Concrete Slab
Concrete Slab
Concrete Slab
Conerete Fad

5000 bbl
5000 bbl
10,000 bbl

Storage Av-Gas
Storage, Jet Fuel

Tank, Steel,Welded, Vertical (f-2

Sand Blast Pad

15x25!

12'xi2t

200 tx300 1

tere

Wood Frame - Canvas Cover

Hot Locker Bldg.
Barber Shop
Air Force Mail Roon
Air Force Gym

16'x34!
8x32!
20 'x25!

TYE

Shed

Storage Shed
Paint Storage

24x26!

Ooo Q

564,
565

bso!

12'x20!
12 4x15!
Stx16!

547

549
550
551
552
553
554
555
556
557
558
559
560
561
562
563

Shek
12'x18'

7

» BE

Jet Warm Up Pad

Stobage, Av. Gas

10,000 bbl

Tank, Stecl,Welded, Vertical (T~1

Tank, SteelWelded, Vertical

‘
Gb G&Scages te RRR& Kat
ae

ional Archives
Reproduced from th
Pacific Southwest Region

(T-3

Storage, Jet Fuel

Tank, Steel,Welded,Vertical (T-4

&v-Gas Fill Stand

Steel Platform ~ Goncrete Pad
Steel Platform ~ Concrete Pad
Steel Platform - Conerete Pad

566
567

575

576
577
578
579
581
582
583

584
585
586

587

588
589
590
5A
592
593
3%,
595

5%

597

. Av-Gas Fill Stand

< Mo-Gas Fill Stand
%

F.

W.

Tank

ret enpeeerenereereetrtraerreteeens

569
570
571
572
573
574

Select target paragraph3