CHAPTER ti, SECTION 2

Acrial View of Sites Dog and Easy

ning. Additional tests were scheduled, including

three barge tests which required several additional major reinforced concrete structures.
On Eniwetok Atoll, a Barge Slip and Assembly
Area at Elmer and the scientific work required
in the Ruby-Sally area likewise exceeded the
preliminary planning. Additional work also in-

Ee
a

Figure 2-28.

anae

=
7

This additional work required a further
review of construction equipment sequirements.
The asphalt paving equipment was in very poor
condition. It had heen acquired as used equipment in 1949 and had been subjected to a great
deal of use in previous Operations and required
replacement. New equipment of the traveling
type was purchased which was more adaptable

a
‘<0, —"

44;

®.!“.
tee

On Bikini Atoll, the construction program

ultimately far exceeded the preliminary plan-

cluded a large scale paving project for the additional airstrip requirements and Air Force
Buildings on Fred.

Aei'al View of Site Able
Page 2-53

SR we oe

of construction equipment ana manpower could
be projected.