CHAPTER Ii, SECTIONS 1A-1B
tific Stations and ranges established for the post-

blast survey of the Station 20 were accepted by
the Scientific Group.
Station 10 was moved into the Flora crater,
and its position and movement checked by the
same procedures used for Station 30. Due to the

late scheduling for moving this station to the
Flora crater, it was not possible to re-establish

precise control in the area by expansion from
the primary network. However, satisfactory

local control established during OPERATION

IVY was recovered and assured the positioning
of the barge to required tolerances.

SECTION 18
TESTS AND INSPECTION
GENERAL
Operating as a part of the Engineering Division, the Test and Inspection Department,
under the suzervision of a principal engineer,
was divided into two distinct sections - Field
Inspection and Materials Testing. The primary
function of the Field Inspection Section was to
assure that a!l work performed and alli materials
used complied with the approved plans and
specifications. The primary function of the Ma-

Yoo

, eww ww

v4

ae

7
ne issod

Figure 2-19.
Page 2-46

Coral Rock from Site Nan.

terials Testing Sec 1on was to undertake physical tests on constru tion materials and to assure
physical compliance’ with specifications.

MATERIAL TESTING SECTION. The Ma-

terial Testing Laboratory on Elmer was used
as headquarters for the Test Section with a

branch base for the Bikini Atoll located on Tare.

The bulk of the work consisted in obtaining
samples and testing construction materials such

as cement, aggregates, concrete mixes and as-