CHAPTER Ill, SECTION 5 since the IVY demobilization level was adequate for the opening phase of CASTLE. U. S. Army from the fresh water Mayberry Slough to the Armybase in the San Francisco All procurement of subsistence supplies to be shipped overseas was covered by strict specifications arranged between the Jobsite and the Home Office Procurement Department. Al branches of the food industry were, after close inspection of their plants and service facilities had been made, canvassed for bids for the supply of Holmes & Narver requirements. A thirty-day lead time was established after receipt of requisitions to request bids, assure delivery by vendors, receive, inspect and make final shipment. This cycle was completed every thirty days. Better methods of packing were conceived to ship highly perishable vegetables and fruits without undue loss. Green-leaf vegetables were delivered av Jobsite in a fresh condition up to five weeks after the date of purchase. Strict inspection of {rush meats and adherence to specifications resulted in shipment ot quality products at minimum cost. EXPORTING AND PACKING It ‘ad been determined through advance engineering estimates, that cement would be in heavy u mand. Past experience proved successful in negotiating the purchase of lumber on a blanket purchase order, and it was decided to use this same tvpe of purchase order to fulfill cement requirements. This decision climinated a large amount of paper work and detail in- volved in unit purchasing. ao On 23 June 1953, a request was received rom the Jobsite fer 150,000 aallone nf bitumiuds, anf delivery was required by 15 September. On 1 July, advice was reccived in the Home Office that a sizeable quantity of the bitumuls would be required in Honolulu not later than 21 Juty for transshipment in a Navy tanker. This presented a Stateside-to-Honolulu transportation problem since the Navy had ho continental coastwise tankers available at the time. and commercial tankers are limited to their ability to carry this type of commodity because most ship bottoms are utilized for their own fuel supply or for fresh water. Through close cooperation between the Contractor and various oil and steamship companies, the problem was solved. Negotiations were concluded over the Fourth of July week end for space aboard the tanker Hawatian Forrester, whose Captain agreed to take on additional fuel at Honolulu after the bitumuls were transferred to the Navy tanker. The balance of this bitumuls order was shipped directly from Wilmington, Calfornia aboard a Navytanker on a direct sailing schedule to Eniwetok. The transocean movement of four 585-ton barges frovn California to Eniwetok was an in- teresting accomplishment. The barges were re- leased by JTF SEVEN, Washington, D.C. from a remote section of the tnarine storage activity at Rio Vista, California, and were towed bythe Bay, where the barges were specially outfitted for the long haul to the Marshall J-lands. From the Bay Army base, Navy tugs U>s Tawasa and USS Munsee each towed two barges to Pearl Harbor; at Pearl Harbor the Navy Tugs USS Mectobi and USS Hitchiti took over and towed the Larges to Eniwetok Atoll. The cntire water movement was accomplished without damage or delay. Packing of material and equipment for export was a function of the Procurement Department’s Traffic Section. Where export packing was not provided oy the vendor, it was accomplished either under a contract with Pacific Ports Industnes, Oakland, California, or by the Holmes & Narver warehouse personnel in Los Angeles. The methods and procedures used in handling the exporting and packing coincided as nearly as possible with customary methods established by the Bureau of Forcign and Domestie Commerce - U.S. Department of Commerce. Scheduling of all shipments began with the receipt of requisitions. A requisition received in the Home Officer was first directed to the Chief of Operations’ office to detennine the most feasible means of transportation. The purchase order was then written as determined by the Material Control Section. [n many cases during the program in which the purchase order called for water shipment, a change had to be made to air freight due to the urgency of the work involved. Material scheduled for transshipment to the Proving Ground via water was delivered by the vendor to the Naval Supply Center( NSC) in Oakland where it was manifested and held for loading: aboard cargo vessels. The Western Sea Frontier allocated space aboard the vessels according to the ameuunt of Holmes & Narver material to be shipped. A Contractor representative was stationed at NSC to receive and schedule all water shipments. If the material was to be shipped by air freight. a priority permit was required. All materials received at NSC or Travis were checked for proper packing and marking for shipment to Jobsite. TRANSPORTATION AIR SHIPMENTS. During the period from 1 January 1953 to 30 April 1954, air freight shipments amounted to 603,205 tbs. The two peak months were November and Do cember 1953, when air freight shipments reached 98,198 and a9.to4 Ibs. resepctively. The shipment of such large quantities of air freight: was accomplised through close cooperation between Holmes & Narver representatives and Air Force Base personnel. However, temporary delays of air shipny ‘ rtmt Be bets aN ce pte es ee me oe salamnd ats L Page 3-21

Select target paragraph3