CHAPTER II, SECTION §
cided upon. This unit was located inside the
entrance to the building so it could be witain
the protection of the Station. In addition to
this portable generator as a supplement to scientific power, a 30KWportable was also provided
to serve the Station power requirements. Fi,
2-204 is a typical interior view of these Scien
Power Plants.
4°
ENGINEERING. Seventeen drawings and one
sketch were prepared and submitted from 30
June to 11 August 1953. These plans were approved at various dates from 3 July to 14
August.
geebigs
a irke cee TERE owed
Figure 2-205. Scientific Power Plants,
NA-500 - 31° Completed
Led on & September 1953 and was completed on
city of the powerhouse. There was no room for
an additional Fairbanks-Morse unit, therefore a
135KW portable heat-exchanger unit was de-
Figure 2-206.
CONSTRUCTION. Building NA-500 was started on 16 September 1953 and was completed on
5 January 1954. Figure 2-205 shows NA-500
as 31% completed on 2 November with the outer
walls poured. CH-500 was started on 16 September 1953 and was completed on 14 January
1954. DO-500 was started on 29 November 1953
and was completed on 14 January 1954. Figure
2-206 shows the entrance of NA-500 on site
Nan. Work on reactivating U-108 was start9 October. TA-500 was started on 15 October
1953 and was completed on 2 January 1954.
Figure 2-207 shows the interior of a power
house as completed.
Scientific Power Plant NA-500 - Entrance
Page 2-205
te
.
some
le see
cas vntnnabwctesseeresertallean oboewe. uti
“