started on 28 September and was completed on
STATION 2220 - PIPELINE
foundations poured and rear wall forms in place.
Figure 2-153 shows Station as 84% completed on
30 December. At left is shown Station 2231
(vacuum Station) and Station 2230 (2-pipe
array). Figure 2-154 notes interior of Station
nearing completion.
GENERAL. This Station consisted ot a pair of
pipes, or two-pipe array, 5544’ - 0” long supported by wood frames spaced approximately 20
feet apart. Pipes were fabricated and installed
as reported for Station 1203.
The vacuum
20 January.
Figure 2-152 shows blast wall