CHAPTER II, SECTION 5
Figure 2-91.
Station
View
cof 102 - Exterior
.
“et
.
a a
August and was completed on 23 January 1954.
Figure 2-90 notes the interior which was typical
of the Recorder Station series. A pair of 6” pipe
sleeves were located on the rear wall, adjacent
.
to the blast door. In the floor, with cover plate,
weg
was a 6” x 6” trench.
STATION 102 - RECORDING STATION
SITE OBOE - USER: SANDIA
,
c
GENERAL.Similar to Station 101.
"
ELECTRICAL, Similar to Station 101.
MECHANICAL. Similar to Station 101.
3
ad
J
ENGINEERING, Reported under Station 101.
oe
ow
CONSTRUCTION. Work was originally sched-
A. .
pleted by 15 January. Actual work started on
ae
uled to commence on 1 August and to be com-
2 September and was completed on 6 February.
Figure 2-91 shows the Station as 95% completed
as of 8 January. The wing walls and pipes are
shown prior to the earth fill. Figure 2-92 is typi-
cal of the series as completed with earth fill.
we
fo.
nd ;
.
2
oe
,
STATION 103 - RECORDING STATION
SITE OLIVE - USER: SANDIA
Of
we
GENERAL. Same as Station 102.
dy ‘ea
ELECTRICAL. Sameas Station 102.
Al “a
-MECHANICAL. Same as Station 102.
Figure 2-92.
Station 102 - Typic:
of Series
af
|
oO
-Page 2-99
ee
ENGINEERING. Because of an error in the
construction survey, which was not discovered
until final checking of the field notes, this Sta-
-
=
4]
ibe
1 + -— ~- o> arenes dae