CHAPTER !I, SECTION 4
ee
a
he
f
7
i
r
Figure 2-63.
Figure 2-65. Parachute Tower - Site Fred
Airstrip - Site Janet
CONTRACT ITEM NUMBER 4-67-C
MISCELLANEOUS CONSTRUCTION
BOTH ATOLLS
copter mat and clearing on site How, concrete
deadmen, additional electrical wiring of various
GUNERAL. This Contract Item consisted of
some 42 miscellaneous jobs. Some of the larger
ENGINEERING. All drawings and field
sketches were prepared by Field Engineering.
these
jobs
Culisisted
of
iaVigalional
lage
lights, alterations to radiac building, decontami-
nation barge, rehabilitation of airstrip on site
Janet, storm damage repairs on Eniwetok and
Bikini Atolls, cargo pier damage repairs, heli-
Figure 2-64.
Page 2-82
A eeeT
Pe er Oe
CONSTRUCTION.
Work started on 1 July
1953 and ail items were completed by March
1954. Figure 2-63 shows the airstrip at site
Janet after rehabilitation. Figure 2-64 notes the
Helicopter Mat - Site How
ane we ee
of
facilities, and recreational facilities on site How.