d.

Quarry,

rock crushing,

screening and central mix batch plant

operations and equipment lists.
e,

Landing ramp.

See Appendix B.

A ramp will be required on the lagoon side

of Runit close to the storage area to unload dump trucks laden with
contaminated material from outlying islands,
graded to a maximum slope of 10%,

The ramp site will be

A leveling course of gravel will

be placed prior to placement of precast concrete slabs,
will be 40'-0O" wide to accommodate LCU landing craft.

will be removed by explosives,

The ramp
Coral heads

The Navy shall verify suitability

of the elevation of the toe of the ramp for the operation of the
craft used,

f,

Water Supply.

(1)

A brackish water supply will be provided for the laundry.

The skimming well will be located near the test pits contained in
reference 9,

The location is close to the end of the runway which

will provide a good recharge surface area to replenish the fresh

water supply.

seepage pit,

Waste water will be disposed of by utilizing a

*

See Appendix D.