(3)

During the slurry placement the keywall on the north

end of the crater on the exposed reef can be constructed.

It is

estimated that 1/2 of the keywall on the north (seaward) side of the
crater will be anchored 1'-O into firm coral reef and the remaining
1/2 of the key wall will be embedded to a maximum of 8'-O into

factured coral reef and where no reef exists.

The applicable keywall

to use will be determined in the field.

oN
(4)

The amount of contaminated materianay

eee

be known by

*

ae

this time and the configuration of the mound determined.

of

The location

the keywall should be staked out and all surrounding material

within the containment area removed to the elevation of the existing
coral reef located on the north end of Cactus Crater,
(5)

Complete construction of

the enclosing keywall.

(6)

Placement of the contaminated concrete mix above the water

line shall be compacted by vibrator roller and shaped to receive the
concrete cap.
b.

Keywall,

The concrete keywall will be constructed completely

around the encrypted material.

The pace data (reference 7) indicates

(Rev. 16Dec76)