6,

provide plans and details for a brackish water system for the

laundry,

7.

provide design for

the electrical distribution system and

flood lighting,
8.

provide equipment list for concrete slurry placement,

9.

provide design of ramp at north end of Runit for off loading

dump trucks,

C.

pescription of Work,
1.

Encrypment of Contaminated Material.

The volume of contaminated

material will vary from70,000 cy to 200,000cy._ Drawings have been

prepared to show the configuration to contain this variable volume.
The concrete slurry mix which is placed under water may require from
me

2 - 8 bags of cement per cubic yard.

aad

The amount of cement required

will be determined by Waterways Experiment Station (WES).

The

concrete mix of the contaminated material placed above water will be
ee

approximately 2 bags of cement per cubic yard.

This mix will be

compacted by a vibrator roller to obtain a stable compact mass,
Placement of the mix above water may be by concrete pump, transit mix,

Select target paragraph3