The area will be fine surveyed and isopleths drawn

which define the region which exceeds local background.
(>)

;

Vertical soil profiles will be taken to evaluate

the effectiveness of excavation as a means of reducing the Resuspension
Potential.
(c)

An-iterative excavation plan will be executed to:
1.

Reduce the half hectare area average concentration

2.

Reduce the average concentration of the "defined

below 100 pCi/g.

region'' to some lower number which shall be determined by cost-benefit
considerations but will usually not be below local background.
(d)

The region will be resurveyed and the results

documented.
(3)

Condition C:

When a quarter hectare is determined by

either direct measurement or extrapolation to exceed 40 pCi/g (at
the 67 percent confidence level number), the following actions will be
taken:

(a)

The area will be fine surveyed and isopleths drawn

which define the region which exceeds local background.
(2}

;

Vertical soil profiles will be taken to evaluate the

effectiveness or excavation as a means of reducing the Resuspension
Potential.

(c}

An iterative excavation plan will be executed to:
1.

Reduce the quarter hectare area average concentration

C-2-E-6

“

o,f pene
ri
vw: aid
7, eg
ans
.

SC ES ARI EY

wena «aus
2

*,

ye

ENT ee SR ee Use

fe ty
1
Poe
.
.
74.
+
‘

~~

7

4

‘

ey

tM Re ee
’

a
~~ ~~ ET 2 7 a
ee ee
le we
ease
ater Re ge re pe wy
. .
oa
.
ety
aie
:

|e

(a)

Select target paragraph3