17 November 1976
PODED-G
Quarry, Rock Crushing, Screcning and Central Mix Batch Plant Operations for
Cleanup of Enewetok Atoll, MI.
b.
Recommend providing a nearly rectangular shaped stockpile 100
feet wide x 150 feet long. Height is approximately 8 feet.
Clear and level 12 feet beyond the periphery,
Stockpiling waste aggregate (predominately sand) resulting from
aggregate processing operation.
Sand
Produced
=
(32,000 c.y.)(72%)
Stockpiled
23,700 c.y.
6,600
Waste
Washing Loss
=
c.y.
17,1007 c.y.
(32,400 c.y.)(5%)
=
1,650¢ c.y.
Stockpile approximately 17,100 c.y. of excess sand in a nearly Square
area 150 feet on each side.
Height is approximately 13 feet,
Stockpile approximately 1,650 c.y. of washed fines in a nearly square
area 60 feet on each side.
Height is approximately 10 feet.
Generalized layout of aggregate processing area to establish overall
area requirements.
(Conservative estimate)
EACESS
SAND
i *®A,
WASU FE ,
AS
INES
rr
CRUSHER, ~~,
SCREENING,
SAN O
WASH PLANT
‘
3/4" TO
"
No.4
LY
—
Scale;
1" = 200'
Recommend a site encompassed by a 530 feet diameter circle be
designated as an aggregate processing area.