= SRonce Project 5.2 - In-Flight Participation of a B-52 - lst Lt. F. L. williems QRTECTIVE The objective of this test was to determine the delivery capability of the B-52 aircraft, = Instrumentation of the B-52 fo (Apache) consisted of 710 oscillograph channels which recorded measurements from strein-gage bridges, accelerometers, roll and pitch gyros, radiometers, control position transducers, thermocouples, pressure transducers, and calorimeters. In addition, 14 cameras recoried photo-recorder instruments (14 channels), wing deflection, cloud coverage, and fireball rise and grovth. Rar TION IN SP The following chart shows the airplane's position at sero tine and time of shock arrival: Altitude Conditions at f Zero 24000 Comtition at Arrive)34000 RESULTS Offset Heading Slant Distance 2¢00 9 2). 1} 38700 £3890 ft ae There)Energy: ae at (ft) Velocity (fps) TAS Ground 140_730 757747 655 by a 1€0° field calorimeter pointe! straight down. Teepersture: 213°F was measured on a bare, .025 alumimm lower surface elevator panel located at ES 230, The absorptivity of this panel was .50, 4257 AVAILAGLE COPY -~l6<. wan oS

Select target paragraph3