Reproduced from the holdiags of the National Archives
Pacific Southwest Region ~

4023

ORFICIAL-UGE-ONLY

Mr.

P.

oe

BEST COPY AVAILABLE
W.

Spain

Deputy Director, Teast Division

:

CorataHo. AT-(29-2}-20

sir:

Janumry 9;

-

PO. BoxBhOO.tons Offioe
Albuquerque, Hew Mexico
Subject:

R

1956

REPOSITORY Bee“Sepeee
oe
scuccnon KE 326 ATOMIC EWEREY COMMISSION
BOX No. 264.20. GF28) Alblg4

rotpen AAveY StAMD

3é6 =658 730 - -

10 Np, 1953

Replying to your letter EIP:EW-1397 of Dacenber 24, 1955, on the subject of .
Off-Atoll Support, and eupplenenting our letter No. 412 of December 23, 1955.

there are subaitted origina] cost cetimates covering all known vork require- |
nents of the nature of Job I coustruction, which estimates sre momerized as
follows:
.
Eotinate Number

Location

§3501-0

Wotho

53503-0

Kusaie

53502-0

53504-0
53505-0

—

Rongerik
Ujelang

Construction Time

Het Cost

21 days

$ 68,220

5 éays

41,830

7 days

24 210

9 days

Utirik

12. days

TOTAL

53 days

Gross Cost

& 124,095

5 h15
23.145

30,665

(8,260

§ 169,345

$ 283,675

420

52, 760

It is desired to point out the temporary camp facilities to provide masping,

housing, storage, and utilities have been estimated and are considerednecea-

sary to support personnel] st three sites, vamely Ujelang, Utirik., ané Wotho;

and it is considered that the existing weather station camp facilities at

Rongerik and Kugaie are sufficient to accomodate operation personne] jiocated

et these sites in connection with the scientific program. The estimates subuitted herewith comprise caly Job I, construction, end specifically do not
include eupport services for scientific perscanel; operation expense, Jobd It,
involving camp operetion; or maintenance expense, Jot III, which costes are

carrieé in our accounts on an overall beele for the vhole operation at Pacific
Proving, Ground.

Our suggested method for accounting for theae indipect costs of operetiang

proposes that food costs he assessed at the rate of $1.50 per day per nan

for 6 standard Jobsite mami. Coste sbove this ancunt, aa woll aa the cost
of watex and fuel, would be absorbed ac a part of the overall operating

expensa of the operation.

OFFICIALUSE-ONTY

PECLASS IFIED FER DOE
LETTER DATED QUERY, 25. 1994
FeOU ENON SINISGALLI TO
a

~

DEANE

4

EL

_

re

~~

ONG BOON