e.

Inertia
Work undertaken on such items in connection with guided missiles

and rockets indicates a high degree of competence in the development and
subsequent procurement of these items.

There has been no Air Force par-

ticipation as yet in aEC programs of this nature.

f. Inpact
Experience has been acquired by WADC in this area through guided
missiles and rockets developments, but no development or procurement
work has been performed for the .iEC.

Competence in development and pro.

curement is high on the part of the ir Force.
g.

Hydrostatic
The air Force has no development or procurement experience in

s field.
Power Supplies

a. Batteries

t

The Air Force has a fine background of experience and competency
in both development and procurement but has not assisted the AEC
materially in this area.

b,

Wind Generator

No assistance has been provided the AEC by the USAF in this area

ke

but the latter pussesses an inherent competence for development and procurement since these generators resemble closely other items of Air

.~

oo

Force equipment.

ce. Turbines
Work on turbines of all types has been extensive in the Air Force
and competence is high for development and procurement of these items.

Hora

)

To date, no work or procurement in this area has been performed for the
AEC.
9.

Test Equipment
Some work has been performed in this field for the AEC such as pro-

vision of the range checker for the Archie by the WADC.

A great capability

exists in the Air Force for both development and procurement since many types

of test equipment using similar components are developed and procured for air

Force usee

jim,

‘

- ee

COPIED/DOE

SANDIA RE

(8

Select target paragraph3