e. Inertia Work undertaken on such items in connection with guided missiles and rockets indicates a high degree of competence in the development and subsequent procurement of these items. There has been no Air Force par- ticipation as yet in aEC programs of this nature. f. Inpact Experience has been acquired by WADC in this area through guided missiles and rockets developments, but no development or procurement work has been performed for the .iEC. Competence in development and pro. curement is high on the part of the ir Force. g. Hydrostatic The air Force has no development or procurement experience in s field. Power Supplies a. Batteries t The Air Force has a fine background of experience and competency in both development and procurement but has not assisted the AEC materially in this area. b, Wind Generator No assistance has been provided the AEC by the USAF in this area ke but the latter pussesses an inherent competence for development and procurement since these generators resemble closely other items of Air .~ oo Force equipment. ce. Turbines Work on turbines of all types has been extensive in the Air Force and competence is high for development and procurement of these items. Hora ) To date, no work or procurement in this area has been performed for the AEC. 9. Test Equipment Some work has been performed in this field for the AEC such as pro- vision of the range checker for the Archie by the WADC. A great capability exists in the Air Force for both development and procurement since many types of test equipment using similar components are developed and procured for air Force usee jim, ‘ - ee COPIED/DOE SANDIA RE (8