PROGRESS REPORT NO, 12 1 Octeber 1958 to 31 Octeber 1958 Subsontract Fo, 108, Appendixes B, C, and D Ris inforsel menthly pregroys veport is the twelfth of a series submitted in partial fulfiliment of Subcombyact No. 108. Tho information is regarded as Ali components for the two heade being made in accordance with the revised design have heen fabricated, Agsembly of the heads will be completed by 7 Hovember, ili, Electronics Complete. iV,Wind Tunnel Tests Complete, ¥.. tests The actuation of all sealing devices in the redesigned heads, as well as their ability to maintain an internal vacuwm, will be tested at CDC during the week of 10 November, Drop tests, allowing the heads to impact in the water at 35 feet per second at various engles, will be conducted at Morris Dam Smal] Calibre Range, Azusa, California, during the same week, Flight tests are scheduled for the week cf 17 November at NAMIC, Point Mugu, to evaluate the redesign under actual conditions, provided that sealing is satisfactery in the pressure and drop tests described ahove,