mendives B, & C, 2 and BD
“his informal monthly procress report is the eleventh of a series suksitte
im partial fulfillment of Subcontract No. 108.
The information is regarded
a
t
as preliminary end subject to further verification
and analysis.
JoabSLE
Dravings of the redesigned head vere completed,
ii,
Manufacture and Celivery
Fant
two heads, made in accordance with the new drawings, are being fabricated
and are expected to be completed by 31 October.
ATL.kiectrenioes
Complete,
i¥.
Wind Tunyei Tests
Cexplete.
Ve
fests
The two new heads will be tested at CDC and at the Morris Dam Small Calibre
Range, Azusa, between 1 and 15 November.
Fressure and drop tests, similar to
those conducted during 4ugust on variously modified heads, will be conducted to
determine the effectiveness of the head sealing system.
Two flight test rounds,
using the two new heads, will be fired during the week of 17 = 21 November at
NAMTC, Point Mugu, to evaluate the redesign.
VI,
Prototype Firings
Disposition of the remaining rounds has not yet been decided.