irst formal discussion regarding the transfer was held 24 July 1959 by spresentatives of interested agencies; Pacific Air Force Base Command, S Army Hawaii, Headquarters Pacific Air Force, Airwaysand Air aa ommunications Service, 1502 ATW (MATS), US Weather Bureau, and , \ au »S, Coast Guard. Cther meetings included personnel from U.S. Army i" acific, ltth Navy District, and Pacific Missile Range. Target date for e transfer was tentatively set for December 1959. A proposed transter ‘reement was forward to higher Headquarters on 23 September 1959. the items which have , J-6 Report: | As for Eniwetok 28 July 1959 ern l in vartous stages of design and been mentioned fax before are stil study and completion by H&N. As for NTS, the 4 new 500-foot deep been drilled’and cased; the contract 36" diameters holes in area 3 have NTS. the contractor has pul fed out of was completed on [0 June 1959 and of ussion and some solidification There has been considerable disc ideas J-6 . and containing the underground. relating to the solution of firing d be h have merit any one of which coul Is drafting the various ideas whic BY ent, a radchem sample, and alpha used to provide complete containm measurements. The deep holes formerly listed at 1100 feet are now proposed for |200-toot depth with the new figure based on the most recent thinking for absolute surety of containment, law of 550 w to the 1/3. i.e. a scaling In addition to numerous other design and engineering and study items concerned with NTS underground testing, post shot explorations are progressing slowly in area 3. the r (ATSD for AE) on 28July 59 to Here is a memo from Herbert Lope TF the future status of , and the Chief of DASA on USAF gy, Ener ic Atom for t assistan f the with e cipl prin in t emen agre AEC having indicated the EPG. He states that, the Defense also agrees rts on the EPG, the Secretary of conclusions of the current repo to the minimum required at the EPG should be reduced that personnel and equipment ed DOD organizations are to bility and that the associat for a 12 month response capa ed. ning changes as already agre proceed with functional and man

Select target paragraph3