rozndSRSemg Resipn LOG BUILDING, Engineers - Constructors | | OF oe NUMBERw/ogO: 43hh00A. STRUCTURE, STATION 3440.02. OR STATION: : / DESCLIPTICN | boxinstatted,Electrical work completed. (C/M forces departed Awaiting final inspection. Lc: ges Neto Rec Vo SAME A .. AS — tAST WEER ow ai4)se ey| FNAL INSPECTION TRIP, DNLy 1 Hor Bow iwwiTaureo, (OTHER en £(ECT. Werk OL. 1 F-39 | Wotho on 20 March 1958 Possible work remaining, install two hot boxes now at Wotho unassembled. 4/5,L58 GS | . | Three hot boxes prefabbed but per User request, only ene:- 98 3~29-58 | SS | WOTHO Sits s | a — JOP FOLDGE: __ oO | SHEST Saw SPaosea/ | CONSTRICPION PROGRESS Reproduced from the holdings of tae National Archives Forimay 4