[ CONSTRUCTION PROGRESS
LCG
=“
HCLIES & NARVER, INC,
Aneineers -— Constructors |
SHEET
OF
¥
BUILDING, |WewamOF|SURBRTw/o #0:
STRUCTURE,
RAD-SAFE STATION -
OR STATION:
| _DATE
3—29=58
g
98
19600
itm
Sichs
DESCRIPTION_
.
Screening installed gin five tents.
One reefer installe
fly on one tent,
CHECK
Scie.
CUT
Work remaining:
install
Awaitingfinal inspection.
AEC NPS
29
haat tthe.
LD BPEBELCHE |
Aik
Fly not.
Reefer man says fly not|
necessary on this storage tent (7).
1 F-39
-
Construction forces completed the following: work «on 20 March
installed on one 4-man tent.
49/3 99
1
oe
WOTHO
complete but at location other than shown on plan.
4/1 4/34 94
:
JOP FOLDER :
ee
1958:
416/38. 94
;
PA |$P
Ween OUT,
Nbr,
STE
LEG'’o? - VSER
MO FET
SAYS.
AEM €fP ALY ch HEEXCEAFEEG
STN (hAbISOMS
PafieSoatirwestRegi