CONSTAUCTICN PROGRESS
LOG
BAD@SAYE STATION
3e29~58
-
SHEAT
.
LUMBER |i‘O WO
poe
R
OF
19600
JOR FOLDUE s
Sits. WOTHO
—————=
DATE
«HOMERS & NARVES
Angineers - Constructors
tee
were
eneon enece ne engage hs ee ST eC OTe ONEtpOMRONEND | Eye Preeee a
BUILDING,
STRUCTURES,
OR STATION:
be
|
~~Ta
eeENC
%
98
“DESCESIPTICH
Construction forces completed the following work on 20 March |
1958: Soreening installed on five tents. One reefer installed A
complete but at location other than shown on plane
Fly not
installed on one 4eman tent. Reefer man says fly not _
necessary on this storage tent (7). Work remaining: install
fly on one tent. Awaiting final inspection.
1 F~39